Project Name:
Integrated Sewage Equipment Project for Sewage Treatment Station of Control Source and Interception Project in Changqingqiao Town, Ningxian County, Gansu Province
Processing Water Volume:500T/D
Project Overview:
The wastewater in this project adopts our company's newly developed core patented technology process of "pre-treatment system+ST reverse thrust high-efficiency denitrification+aerobic MBR", which can ensure stable and standard discharge, achieve reuse of reclaimed water, and reduce one-time investment and operating costs. At the same time, workshop equipment assembly greatly reduces on-site installation time and saves a lot of construction time. According to the inflow water quality indicators and environmental protection requirements of the project site, the integrated sewage treatment equipment drainage water quality indicators comply with the first level A discharge standard in the "Pollutant Discharge Standards for Urban Sewage Treatment Stations" (GB18918-2002). The project installs an online monitoring platform to strictly monitor the effluent water quality in a timely manner. Currently, the effluent water quality of the project has reached the Class III surface water quality standards.
Project rendering
Project actual photos
Fish can be raised in the outflow pool
Water quality testing report:
Post time: Dec-21-2023